SIOUX FALLS, SD -
The experts on pedestrian traffic coatings brings you the information you need on one website! We have information on all pedestrian traffic coatings manufacturer's, including Pli-Dek, West Coast Specialty Coating Systems, Desert Brand, Life Deck, Tufflex, Mer-Kote and Dex-O-Tex systems. Browse our website for articles, videos, news stories and more. We'll be updating and adding more pages soon so bookmark this site and come back and visit!
Visit our Pages!
Wednesday, June 3, 2015
"Extinguished" Cigar in Potting Soil Ignites, Causing ONE MILLION in Damage!
SIOUX FALLS, SD -
Thursday, July 24, 2014
SIXTY CONDOS Damaged/Destroyed by Smoldering Cigarette Disposed of In Plant on Condo Balcony - Causes TEN MILLION In Damages
One balcony
One potted plant
One cigarette disposed of into potted plant
One fire
Ten Million dollars in damages
Sixty condo's destroyed or severely damaged.
Hundreds of people lose homes, possessions.
Zero loss of human life
Zero loss of fur kids.
Cheap building construction blamed by some-vinyl siding and OSB and defective fire walls to blame?
Time to ban smoking on balconies? Or plants?
From CTV News Edmonton
Published Wednesday, July 23, 2014 12:55PM MDT
Last Updated Wednesday, July 23, 2014 7:22PM MDT
Read more: http://edmonton.ctvnews.ca/damage-estimate-for-condo-fire-increases-to-10m-1.1928218#ixzz38Ot0dd9p
Thursday, July 15, 2010
FROM FireEngineering.com-Article- Construction Concerns: Combustible Metal Deck Roofs
For decades, builders have been using metal roof decking supported by bar joists, covered with combustible insulation board and a roof membrane that is often topped with gravel. The earliest of these roofs had melted asphalt mopped onto the steel roof deck to hold down the insulation board with additional melted asphalt mopped between and on top of the layers of roofing felt. This was known as a “built-up” roof and was inexpensive when compared with other types of roofs.
(1)
A potential problem with this type of roof was recognized more than 50 years ago: If a fire heated the underside of the roof deck, it could melt, vaporize, and ignite the asphalt on top of the deck, starting another fire in addition to the original one inside the building (see Brannigan’s Building Construction for the Fire Service 4th Edition, 213-214). This roof fire could spread far ahead of the original fire and ignite other fires when burning asphalt found its way through the steel deck.
Roofs of these types are sometimes inaccurately advertised as “fire-rated.” They do not have a “fire rating” from testing under National Fire Protection Association (NFPA) 251, Standard Method of Tests of Fire Endurance of Building Construction and Materials (ASTM E119) like a wall or a floor-ceiling assembly. Rather, they have been tested under NFPA 256, Standard Method of Fire Tests of Roof Coverings (UL 790; ASTM E-108) for exposure to fires originating outside the building. They are rated Class A (severe), B (moderate), or C (light), based on the severity of fire exposure they can withstand. Tests for the rating include ignition from flaming brands, intermittent flame exposure, rain, weathering, and flame spread.
READ THE REST BY CLICKING HERE!
Monday, May 10, 2010
Desert Crete/Magnesite Decking Systems ICC-ES Report Has Been Renewed
ICC-ES is one of the leading authorities on building products, they evaluate the testing that manufacturer's have done to show that their product is safe and meets the requirements for building codes. Many municipalities have adopted the International Building Code, the International Residence Code or both.
Desert Crete and Magnesite's ICC ES report was recently re-issued as of February 1, 2010. Click to read the report here.
I like Desert Crete a lot, it's what I put down for almost every job I do.
Sunday, May 9, 2010
100 Firefighters Battle Apartment Fire in LA-Check Out This Unbelievable Picture
READ THE STORY AT LA TIMES BY CLICKING HERE
Condo Without Fire Walls In Attics Burns Out Residents
Read about it by clicking here
Saturday, April 24, 2010
Did Desert Crete Decking Help Foil Arsonist In Monterey Firebombing?
In October 0f 2009, someone came onto the property and at several locations threw Molotov cocktails onto the building, in an apparent attempt to harm someone...
25 Displaced After "Suspicious" Apartment Fire in Monterey
Posted: Sep 30, 2009 4:38 AM PDT Updated: Sep 30, 2009 9:03 PM PDTFour apartment units were severely damaged, three cars were destroyed and 20 to 30 people have been displaced. The American Red Cross is helping the residents and a temporary shelter has been set up at Hilltop Community Center in Monterey.
The fire department says that the fire started around 3:30a.m. It was contained in about 30 minutes but crews remained on scene hours after the fire was contained.
No injuries have been reported.
6 engines, 2 trucks, and 30 firefighters were on scene to fight the fire.
The origin of the fire is considered "suspicious" and it is under investigation by the Monterey Police and the Monterey Fire Departments.
We had put Desert Crete decking on a deck over a garage, and on the walkways on the 2nd floor. I remember talking with the owner about the construction methods necessary to achieve Class A/One Hour fire resistant constrution, as walkways and stairs must be fire resistant constructed materials. The deck and walkways were covered in plywood and then we installed Desert Crete in the methods described in the ICC-ES report #1661.
So that's that then right? Well my client called me up to ask about fixing up some fire damaged decks. I took a ride up to Monterey to walk the job with him. This is what I observed...
Joists under walkway at 2nd floor
Garage joists and plywood severely fire damaged.
This pic was taken on the deck over the garage.
The fire ran up into the wall, damaging the 1st floor
apt, then continued up into the 2nd floor apt.
LETS SEE THE WALKWAYS!
This walkway is directly above the garage deck.
There is no sign of fire damage to the decking at all!
Second area of walkway where fire below
damaged joists and plywood. No fire damage evident
at all.
Did the Desert Crete decking system stop this fire before lives were lost? I can't say and neither can anyone else. But you decide what is best for your building; a Class A and One Hour ICC-ES rated system or some crap from the cheapest bidder you can get? It's just your liability at risk...
Saturday, June 27, 2009
Defects in Fire Resistant Construction Cause Hotel/Casino to Close
JACKSON - Newly discovered construction defects are putting a stop to the music at Jackson Rancheria Casino.
Casino management announced Thursday that it is had closed 45 of the casino's 67 hotel rooms, a restaurant and a conference center. A ballroom in the same building will close after a July 9 performance by Robin Trower.
"deficiencies in the construction mean some walls in the hotel don't meet fire resistance standards"
READ THE WHOLE ARTICLE BY CLICKING HERE
Tuesday, May 6, 2008
Decks In the Line of Fire" a good article on deck building in CA fire zones
First 100 Words:
Decks in the Line of Fire Deciphering the code behind fire-resistant construction Bill Bolton As a deck designer and builder on the West Coast, I occasionally build decks in what's called the wildland-urban interface. The geography here is a little different from, say, the woodlands of New England. Winter rains on the California coast support plentiful vegetation, which then dries out in the summer to become a tinderbox (Figure 1). This large fuel source, coupled with high winds in the surrounding mountains and canyons, creates an environment ripe for the wildfires you see on the evening news. Despite the danger,
Click here or our headline to go to the article at Professional Deck Builder online
Wednesday, November 21, 2007
Deck Expert sumbits his idea for Assemblyman Sam Blakeslee's "There Ought to be A Law"
You go to his website at www.assembly.ca.gov/33 and follow the link to the contest page. Think there ought to be a law about something? Me too.
So my idea (I just went and submited it, so I'm looking forward to a phone call telling me how briliant I am to have though of it...) is this;
Require all waterproof deck coatings installed on decks and balconies on homes, condo's hotels and other buildings to have a "ONE HOUR" Fire rating through ICC. Nothing less. This would apply to all new construction and rehab work as well.
It would outlaw the sale and installation of non "One Hour" approved coatings for decks over living spaces.
Would this help save homes?
In my mind, undoubtably.
Deck Coating ICC#'s-a word of caution, they're not all the same
ICC is in my opinion, kind of like the UL (Underwriters Laboratory)of building products. Putting on a building product with an ICC lets you know that the product has undergone lab testing in a series of standardized tests to establish that the product meets minimum standards for use as it was intended.
So can you switch up one ICC rated deck coating for another, without any other concerns? No-you cannot, without first doing your research. Especially when a particular product is specified for a job on a set of plans for new construction.
Even on rehab work, one must be cautious-is the old deck coating your tearing off a "One Hour" Fire Rated coating? If the answer is yes, and many times it will be a yes, one must read up on the various "One Hour" Fire rated coatings and see what the requirements are for framing and substrate to see if your current framing and substrate meets those minimum requirements.
One thing to be really cautious of is installing a Class A or B rated coating in place of a "One Hour" Fire Rated coating. A few of the ICC approved coatings on the web site only have a Class A roof coating rating, not the much more difficult to pass "One Hour" fire test.
Do not replace a "One Hour" System with a system with only a Class A rating. They are not the same thing, even though appearances may be deceiving. Do your research on your options and ask questions.
The way I see it, the product either has a "One Hour" rating on the report from ICC, or it doesn't and that's where I seperate the products from each other. Claims that"it meets ASTM standards" is not the same to me as it being printed on an ICC report.
I don't install anything without a "One Hour" fire rating for my clients.
I couldn't sleep at night of I didn't.
Email Bill@Waterproofdeckcoatingadvice.com for copies of manufacturer's specifications and installation instructions.
Friday, November 2, 2007
Building to protect your home against wildfires-case history
Use only one hour fire rated deck coatings
ONLY ONE HOME SURVIVES DEVASTATING FIRE STORM
Studying the houses that survived the 1993 Laguna Beach fire storm yields lessons in building to withstand the heat
by John Underwood
Fire-Resistant Details
Imagine this: A brushfire, blistering and intense, breaks out on a dry, windy day and races up hills and down valleys, devouring trees, cars and houses. By the next morning the flames are gone, and the heavy clouds of black smoke have washed away to sea, leaving a clear view of charred trees and hundreds of seared foundations. Yet somehow, a few houses still stand, vivid against the backdrop of ruin.
That was the scene in October 1993 after a fire storm destroyed nearly 400 homes in Laguna Beach, California. The fires started several miles inland and swept to the sea at a brisk 2 mph to 4 mph, consuming increasingly thick vegetation along the way. Often, the course of the blaze forced the firefighters to make stands at what they considered to be the least defensible positions: the doorsteps of homes. Frequently, the flames boiled 50 ft. or 60 ft. into the air, and they reached temperatures of 2,000°F or greater. When the fire became that intense, the firefighters then were forced to abandon the structures, which in some instances burned to the ground in five minutes.
Now, more than a year and a half later, rebuilding efforts have begun to reclaim the blackened California hills and bare mountaintops where many houses once stood and where only a few houses remain.The most obvious question homeowners, builders, architects and code officials asked as they combed the rubble for clues was how did a precious few structures survive such an inferno while houses on all sides vanished in the fire? What they learned was a number of lessons that likely will work their way into local building codes and should help to reduce the damage of future fires.
Houses burn from inside out
At 400°F, curtains, wallpaper and bedding ignite. Wood studs spontaneously combust, or pyrolize, at about 450°F (steel studs melt and deform at only slightly higher temperatures). At that point, single-pane windows blow out from heat and ambient-pressure differences. Flame and heat rush in to meet interior combustion, thoroughly consuming structures. Whole houses can reach temperatures hot enough to weaken and spall concrete foundations. According to Laguna Beach Fire Chief Rich DuBerry, many if not most of the Laguna homes lost to fire burned from inside out.
Extreme heat -- with or without direct flame -- compromised the envelopes of houses and ignited material inside by entering houses through vents; poorly sealed doors or windows; and cracks in walls, subfloors or attics.
When such heat is present, destruction is a matter of time. The critical question is how much time is there? Any structures exposed to extreme temperatures and flame long enough will burn. For DuBerry Laguna's lessons are clear: "Keeping the envelope sealed can buy precious time."
Why did some survive in the midst of charred destruction?
The home of To Bui and Doris Bender was called a "miracle house" by the Los Angeles Times because of its dramatic survival in a neighborhood almost totally devastated by the fire. Why did this trilevel structure and a few others like it survive while neighbors' homes on all sides, sometimes no more than 10 ft. or 15 ft. away, burned to the ground?
Cement coatings protect the wooden structure
"It's in the details," Bui insists. He knows about such details. Originally from Vietnam, he lived and worked as a structural engineer in Germany for more than 10 years. There, the predominant building materials are concrete, stone, brick and steel. "In Germany, structures are designed to last hundreds of years," he said. "I built my house to last." He insists his Laguna home is not overbuilt. "It's just that whatever the minimum codes called for, I went a little further."
For example, exterior walls are 2x6 wood-frame construction, which allowed Bui to install R-19 foil-faced insulation (the code requires R-11, kraft-faced insulation). Exterior-wall stucco was as much as an inch thick (nominal thickness is 7/8 in.). Ordinarily, nominal thickness of stucco is 3/4 in.
Eliminate the eave overhang
To prevent heat buildup, this house was constructed without eave overhangs, which also eliminates soffit vents. Cornices are built up with 2x12s and 2x8s and covered with 1-in. stucco. The class-A fire-retardant roof tiles are plugged with metal bird stop. Where 1/2-in. wallboard is the minimal requirement on interior walls and ceilings, Bui opted for 5/8-in. wallboard and one-hour-rated exterior doors and jambs.
Where single-pane windows are acceptable in this mild climate, Bui installed dual-pane windows by International Window Corporation (310-928-6411; www.intlwindow.com) that contain an insulating air gap.
Roofs on the prevailing ranch-style or cottage-style homes in the area typically had 2-ft. or 3-ft. overhangs and undereave vents that trapped heat and flame and induced ignition. Bui eliminated eave overhangs altogether in his design and replaced them with double 2x fascia, which he then stuccoed over.
Ventilation, ordinarily found in soffits, on the ridges of roofs and in crawlspaces, was placed at the midpeak points of gable-end walls. Bui positioned horizontal, eyebrow-type roof vents on the class-A cement-tile roof at every peak, which allows the quick and efficient release of attic heat. That is a critical factor because attic insulation ignites at about 450°F. There are no crawlspace vents in Bui's house.
Minimal gable-end vents and dormer-type roof vents are adequate to ventilate the roof of this Pacific Coast house. Soffit vents are eliminated altogether. The reduced venting meets code for the area because of the greater concerns for fire safety. Behind the vents, 1/4-in. wire mesh was installed to cut the risk that cinders would be drawn into the attic space.
Bui covered wood-deck surfaces with successive layers of a fire-resistant polyurethane and a sand-coating product manufactured by Pacific Polymers Inc. This is a three-part, trowel-applied material that cures to about a 50-mil thickness and carries a Los Angeles Fire Department class-A fire rating. Bui installed scuppered drains before he applied the coating to allow drainage at several points through the subfloor.
Extra layers of protection: Eliminate exposed wood
Wooden deck surfaces are troweled over with several layers of fire-resistant coating. Undersides of all decking are stuccoed over with a 1-in. layer of cement. The glassed-in deck rails are further protection against fire.
The owner of this Laguna Beach house stuccoed the undersides of all wooden deck surfaces to a maximum thickness of about 1 in., virtually eliminating any exposed wood.
Bui stuccoed the undersides of all exposed decking to the same thickness as exterior walls (photo above). The result is a house with virtually no exposed exterior wood.
Every house around Bui and Bender's house burned. But when firefighters broke into the house to search for occupants, the place was a "cool" 100°F, Bender said.
Photo courtesy of FINE HOMEBUILDING - HOUSES
Thursday, November 1, 2007
Tuesday, October 30, 2007
Should it be Law that All Deck Coatings MUST Be ICC One Hour Fire Rated?
I've bid jobs that require a tear off the existing system (due usually to neglect and wear and tear)and replacement with a new coating. I found that sometimes that a bidder with a cheaper (read-non fire rated, non ICC approved)product got the job, based on price. When I try to tell the owner that they are losing their fire protection, often times they shrug and don't care.
I think it should be law/code that only ICC one Hour Rated coatings can be applied to plywood covered decks-houses may be saved or damage reduced. Readers, what do you think?
Post your comments!
Wednesday, September 5, 2007
Should all deck coating systems installed in California be required to be "One Hour Fire Rated"?
With the massive wild fires fires that California is experiencing, shouldn't our deck's be protected with coatings that have "One Hour" Fire ratings too? Fires are everywhere-Griffith Park in Los Angeles, the Zaca Fire, last years San Diego wildfires, Tahoe, the list goes on...
It's my philosphy that decks over living spaces are essentially roofs first, and decks to walk on second. Roofs are required to be fire rated and newly installed replacement roofs must be too.
However, in the case of decks, many decks that are being coated/waterproofed on new and rehab work are not receiving fire rated coatings-despite call outs on plans and specifications.
Should California pass a law requiring the installation of only one hour fire rated deck coatings? It would seem to make sense.
Your comments?







